Short Reads - On 28 June 2017, the Minister of Economic Affairs announced in a letter to Parliament that the tender for sites I and II of the Hollandse Kust (zuid) wind farm is scheduled to open in autumn. As the Minister cannot exclude the possibility that a non-subsidised bid will be submitted, the tender will first open for non-subsidised bids only. If no, or only non-qualifying, bids are received in this first phase, a tender procedure including subsidies will take place.